Steps to our order process
Stickers
1. REQUEST A QUOTE
In order for us to able to quote your job correctly please make sure you know the following details: How many stickers do you need? What type of sticker do you need? What colors do you need? What size do you need? Most importantly have your artwork ready files for us to look at.
2. APPROVE DESIGN MOCK UP
Once you've communicated what you would like to have produced we will create a design mock up for you. We will then send you the design mock up to review and make changes if needed or approve it.
3. APPROVE THE QUOTE & PAY THE INVOICE
After all the details are hashed out, a invoice will be created using your sticker design('s). We require payment in full before we proceed with any order.
4. THE LEAD TIME BEGINS, MATERIALS ARE ORDERED
We will begin the process of ordering your materials if we don't have them in stock. Our standard production time is usually 7-10 business days from date payment is received until date order is shipped or pick up. Sometimes production time is faster, it just depends on the current work load. We will keep you updated on the job progress via e-mail.
5. MATERIALS ARRIVE, LET THE PRINTING BEGIN
If we had to order material's for your order, they will be on the way. Once we have received all the materials needed to produce your stickers, we will start the process of getting your items made.
6. ORDER COMPLETED - PICK UP/SHIP
Once all your items have been made we will box them up for you and contact you to let you know that your order is done. You have the choice of picking up your order from our Santa Ana location or we can ship them to you (we determine if you want to pick up or ship during the quote process). *Please note that shipping time is not included in production turnaround time.
The Details
STICKER OPTIONS / APPLICATIONS
- Full color printed and laminated vinyl sticker
- Window decals
- Plotter cut vinyl
- Race numbers
- CF numbers
- Printed wraps
TURN AROUND TIME
• Standard production time is 7-10 business days. (sometimes faster depending on our current work load).
• Production time begins after the final design mock up is approved and payment in full is received.
ARTWORK REQUIREMENTS
• Preferred vector file formats: .pdf .eps .ai
• Preferred raster file formats: .pdf .psd .tiff .jpg | Rasterize or outline any type layers.
• Ensure all raster files are 300 dpi at full size.
• All artwork should be exact size that you want it to appear on your printed item.
• Include any cut paths
PAYMENT TERMS
• Payment must be received in full before we start any job.